Rivierzicht Promenade

A river promenade built to be flooded: everything below the two-year line is concrete and grass, everything above it is timber and lighting, and the benches face the current.

Waterfronts

Location
Nijmegen
Year
2020
Role
With the river district office
Size
1.1 km
Rivierzicht 1
Rivierzicht 2
Rivierzicht 3
Rivierzicht 4
Rivierzicht 5
Rivierzicht 6
Rivierzicht 7
Rivierzicht 8
Rivierzicht 9
The flood line is drawn into the balustrade.
Plan rivierzicht
Figure-ground, 1:2500